We wanted to put together an update to briefly detail some of the happenings with the new campus as well as share some fun new photos of the big building project! It’s been one month since we received occupancy to use the unfinished phase 1 addition at CR9. The construction crew added a few temporary heaters to make this space comfortable and usable for the remainder of this school year as one large open area. This addition is currently playing host to activities like indoor recess, lunch, art classes, music classes, and library. It’s a nice temporary bonus space that we hadn’t originally planned to use! Once the school year ends, the walls will go up and the classrooms will be finished. Our K5 classrooms will move over this summer to fill two of the three new rooms (the other room will have various uses in the fall and will be a science lab next spring).

At the same time those classrooms are getting finished, another crew will be working hard putting together a freshly paved driveway (ooooooo-ahhhhhhhh). The crews will be moving fast in the summer months to asphalt the entire drive, the phase 1 parking lot, the new phase 2 parking lot, and the lane that will surround the campus. There will be an overflow lot where our busses will sit behind the phase 2 building that will remain stone for the time being. At the completion of these paving jobs we’ll have a few more parking spaces at CR9 than currently exist at the Rush campus. (and a big thank you to Joe Spiers for helping make the current stone driveway drive-able in the meantime!)


As the work on the big building continues, you’ll soon see the plumbing going in as well as getting it all enclosed. Wade Wylie at Link Construction has been working on 3D models of the project to assist the team in planning and design. We’ll share more renderings of the very soon-to-be Home of your Calvary Christian Spartans as they become available!  

(the stage can present to either the gym or cafeteria area which you can see in the background)


 

(Bleacher area has seating for 600. With floor covering to protect the gym floor and chairs on the gym floor we could fit 1,000 in this space!)

(Below are views from the main entrance which will face north. As you drive down our long drive you'll see the flat facing part of the building that has the academic C icon) 